Press "Enter" to skip to content

PUBLIC NOTICE – ARMADA TOWNSHIP

** Hourly rate of Planner applies if requested to review.

Pre-Application Meeting with Planner: $375 at Township Offices or $300 at office of Planner.

Re-Review of a plan, plat or other application within 6 months of original submittal: 75% of original fee.

Review of Traffic Study by Planner’s Traffic Consultant: $950 if <500 trips. Hourly if 500+ trips.

Stamping set (review of minor changes to plan following Planning Commission conditional approval) $150.

ALL ADDITIONAL PLANNER, ENGINEER, LEGAL, PROFESSIONAL OR ADMINISTRATIVE FEES WILL BE BILLED AS INCURRED. These are realistic fees so that tax dollars do not pay for individual gains. Additionally, a deposit in the amount of 6% of the total construction for all underground utilities and paving a minimum of $900 shall be made with the Township for inspection. Fees for inspections will be billed against this deposit on an hourly basis.

Engineering Hourly Rates:

Project Manager: $120.00

Project Engineer: $110.00

Graduate Engineer: $100.00

*FIRE DEPARTMENT: THERE WILL BE A $50 SITE INSPECTION FEE WHEN REQUIRED BY CODE. RE-INSPECTION FEE IF NECESSARY IS $40.

Published: 7/21/21

Mission News Theme by Compete Themes.